Kiru Hydropower Project

GS3 – Infrastructure

Context:

The CBI filed a chargesheet against a former J&K Governor over alleged procedural violations in the Kiru Hydroelectric Project.

  • The project is situated at the confluence of the Chenab River with the Singad and Bela streams, close to Kiru and Patharnakki villages in Kishtwar district, J&K.
  • It lies between the Kirthai II (upstream) and Kwar (downstream) hydropower plants and is expected to cost ₹4,287 crore.
  • The project is under construction by Chenab Valley Power Projects Private Limited (CVPPPL).
  • CVPPPL is a joint venture between:
    • NHPC (National Hydroelectric Power Corporation)
    • Jammu & Kashmir State Power Development Corporation (JKSPDC)
    • Power Trading Corporation (PTC)

Leave a Reply

Your email address will not be published. Required fields are marked *