PM-Kusum

Recently, the first farm-based solar power plant under the Prime Minister’s KisanUrja Suraksha EvamUtthanMahabhiyan (PM-KUSUM) schemehas come up in Jaipur (Rajasthan) district’s Kotputli tehsil with a provision for production of 17 lakh units of electricity every year.

Important points:

  • The PM-KUSUM scheme was launched by the Ministry of New and Renewable Energy (MNRE) to support installation of off-grid solar pumps in rural areas and reduce dependence on grid, in grid-connected areas.
  • The Cabinet Committee on Economic Affairs (CCEA) had in February 2019 approved the launch of the scheme with the objective of providing financial and water security.
  • The government’s Budget for 2020-21expanded the scope for the scheme with 20 lakh farmers to be provided assistance to install standalone solar pumps; another 15 lakh farmers to be given help to solarisetheir grid-connected pump sets.
  • This will enable farmers to set up solar power generation capacity on their barren lands and to sell it to the grid.

Components of the PM-KUSUM:

PM-KUSUM consists of three components and aims to add a solar capacity of 30.8 GW by 2022:

  1. 10,000 MW of decentralised ground-mounted grid-connected renewable power plants.
  2. Installation of two million standalone solar-powered agriculture pumps.
  3. Solarisation of 1.5 million grid-connected solar-powered agriculture pumps.

Benefits of the Scheme:

  • Supports the financial health of electricity distribution companies (discoms) by reducing the burden of subsidy to the agriculture sector.
  • Help them meet the RPO (Renewable Purchase Obligation) targets.
  • Promotes decentralised solar power production, and reduces transmission losses.
  • A potential way to reduce their subsidy outlay towards irrigation.
  • If farmers are able to sell surplus powers, they will be incentivised to save power and, in turn, it will mean the reasonable and efficient use of groundwater. This will also increase their income.
  • This may also provide water security to farmers through the provision of assured water sources through solar water pumps — both off-grid and grid-connected.
  • Expansion of the irrigation cover by providing decentralized solar-based irrigation and moving away from polluting diesel.

Way Forward

  • Consensus between the Centre and States is the key to the success of this decentralised solar power scheme. Any reform in India’s power space cannot take place unless there is consensus between the Centre, States and stakeholders.
  • Apart from switching to solar power, farmers should also switch over to drip irrigation mode which saves water and power with increased crop output.
  • For effective implementation and serious participation by stakeholders, the scheme should be more attractive in terms of benchmark prices in view of the challenges on account of higher costs of implementation and comprehensive maintenance.

SOURCE: THE HINDU,THE ECONOMIC TIMES,MINT

About ChinmayaIAS Academy - Current Affairs

Check Also

What to do with spent nuclear fuel?

Syllabus:  Alternate fuel Context: Japan has started releasing treated radioactive water from the beleaguered Fukushima …

Leave a Reply

Your email address will not be published. Required fields are marked *

Get Free Updates to Crack the Exam!
Subscribe to our Newsletter for free daily updates